Popular Tags

2 Blogs found.
  • Mar 03 2026

    3 minutes, 35 seconds
    150 0 0 0 0/5

    After the residents were moved from the collapsed areas, the City’s appointed emergency contractor moved on site at the two major collapse points in Khayelitsha’s SST section and Makhaza, where preparatory work is under way ahead of the two-point repairs to the 700mm bulk sewer line. This includes i...

  • Jun 14 2024

    3 minutes, 2 seconds
    6374 0 0 0 0/5

    Residents and motorists are advised that a section of Bamboesvlei Road in Ottery, between Woodlands and Cariad roads, has been temporarily closed for safety reasons. This is so the contractor appointed by the City’s Water and Sanitation Directorate can do emergency repairs to the collapsed sewer in ...